Skip to main content

As storm recovery continues, we are aware that the Outage Map is not showing some customers who are still without power. Our internal systems for identifying outages and prioritizing restorations are still functioning.

We know it is frustrating for our customers and are working hard to reconcile the outages shown on the map. Please continue to report outages, as needed.

Our crews will continue to work around the clock until the last customer is restored.

November Wind Storm

Over the last 24 hours, more than 150 line crews and 70 tree crews worked throughout the day and night to help over 22,000 customers regain power from storm related outages.  We now have 98% percent of our customers back online since the bomb cyclone hit Western Washington Tuesday afternoon and will continue to work as fast as we can to restore every customer.

alert 

Safety first. Never touch or go within 35 feet of downed power lines because they might be energized. Call PSE at 1-888-225-5773 or 911 to report problems.

Report and track power outages online

2COL-Hero-GreenDirect-Turbine-text-2

As our region’s corporations and municipalities seek to reduce their planet-warming greenhouse gas emissions, they are also seeking to add renewable power to their energy portfolio. To meet this need, PSE created Green Direct, a renewable energy program specifically designed to meet our customer demand.

Green Direct is a ground-breaking program designed to provide PSE corporate and governmental customers the ability to purchase 100 percent of their energy from a dedicated, local, renewable energy resource, while providing them with a stable, cost-efficient solution.

This program furthers PSE’s deep decarbonization goals and accelerates the move toward clean electricity by 2045, as called for in Washington’s Clean Energy Transformation Act.

Green Direct Projects

The first project developed for the Green Direct program is the Skookumchuck Wind Facility. Construction began in 2019 and the project went into operation November 2020. It can produce up to 137 megawatts (MW) of wind energy—equivalent to powering 30,000 homes.

The project, owned by Southern Power, is located on Weyerhaeuser timber land, located in Lewis and Thurston counties. It is the first large-scale wind project located in Western Washington; and the first in the state to be located on working forest land.

The second Green Direct project is Lund Hill Solar. Construction began in 2019 and the project went into operation in December 2022. It is the largest solar installation in Washington and is capable of generating approximately 375,000 MWh of solar energy every year. 

Lund Hill Solar was developed by Avangrid Renewables, and is located in Klickitat County outside of Glendale, WA on a mix of land leased from private landowners and the Washington Department of Natural Resources, the state’s first solar power land lease.

All 41 total customers in the program, with 18 additional customers added in March 2021, are receiving renewable power generated from a mix of these resources in Washington.

YouTube Video
Green Direct renewable enery program partners
" class="hidden">天津高考网